Essam Shehab, PhD

Head of Mechanical and Aerospace Department (Acting)

Accepting PhD Students

PhD projects

1. Recycling and Disposal Strategies for Recycling and Disposal of Composites Materials 2. Developing Cost Modelling Methodologies for Recycling and Disposal of Composites Materials 3. Environmental Cost Models for Recycling and Disposal of Composites Materials

  • 4330 Citations
  • 21 h-Index
20012023
If you made any changes in Pure these will be visible here soon.

Research Output 2001 2020

Filter
Paper
2015
3 Citations (Scopus)

Long tail uncertainty distributions in novel risk probability classification

Schwabe, O., Shehab, E. & Erkoyuncu, J., 2015. 6 p.

Research output: Contribution to conferencePaper

Uncertainty
Long tail
Manufacturing
Aerospace
Enterprise risk management
3 Citations (Scopus)

Uncertainty of Net Present Value Calculations and the Impact on Applying Integrated Maintenance Approaches to the UK Rail Industry

Kirkwood, L., Shehab, E., Baguley, P. & Starr, A., 2015. 5 p.

Research output: Contribution to conferencePaper

Rails
Condition monitoring
Costs
Industry
Asset management
2014
4 Citations (Scopus)

An aerospace requirements setting model to improve system design

Centrich, X. T., Shehab, E., Sydor, P., Mackley, T., John, P. & Harrison, A., 2014. 6 p.

Research output: Contribution to conferencePaper

Systems analysis
Industry
Engines
Weibull distribution
Distribution functions
4 Citations (Scopus)

Challenges in cost analysis of innovative maintenance of distributed high-value assets

Kirkwood, L., Shehab, E., Baguley, P., Amorim-Melo, P. & Durazo-Cardenas, I., 2014. 4 p.

Research output: Contribution to conferencePaper

Condition monitoring
Sensors
Costs
Processing
3 Citations (Scopus)

Cost drivers of integrated maintenance in high-value systems

Amorim-Melo, P., Shehab, E., Kirkwood, L. & Baguley, P., 2014. 5 p.

Research output: Contribution to conferencePaper

Costs
Rails
Model structures
Resource allocation
Health
2010

Product-service systems across industry sectors: future research needs and challenges

Durugbo, C., Bankole, OO., Erkoyuncu, JA., Tiwari, A., Alcock, J. R., Roy, R. & Shehab, E., 2010. 8 p.

Research output: Contribution to conferencePaper

Industry
Systems analysis
2008
1 Citation (Scopus)

A work breakdown structure for implementing and costing an ERP project

Momoh, A., Roy, R. & Shehab, E., Jan 1 2008, p. 1245-1254. 10 p.

Research output: Contribution to conferencePaper

Enterprise resource planning
An enterprise
Work breakdown structure
Costing
Costs