Essam Shehab, PhD

Head of Mechanical and Aerospace Department (Acting)

Accepting PhD Students

  • 3318 Citations
  • 16 h-Index
20012021
If you made any changes in Pure these will be visible here soon.

Research Output 2001 2019

Filter
Paper
2015
3 Citations (Scopus)

Long tail uncertainty distributions in novel risk probability classification

Schwabe, O., Shehab, E. & Erkoyuncu, J., 2015. 6 p.

Research output: Contribution to conferencePaper

Uncertainty
Long tail
Manufacturing
Aerospace
Enterprise risk management
2 Citations (Scopus)

Uncertainty of Net Present Value Calculations and the Impact on Applying Integrated Maintenance Approaches to the UK Rail Industry

Kirkwood, L., Shehab, E., Baguley, P. & Starr, A., 2015. 5 p.

Research output: Contribution to conferencePaper

Rails
Condition monitoring
Costs
Industry
Asset management
2014
4 Citations (Scopus)

An aerospace requirements setting model to improve system design

Centrich, X. T., Shehab, E., Sydor, P., Mackley, T., John, P. & Harrison, A., 2014. 6 p.

Research output: Contribution to conferencePaper

Systems analysis
Industry
Engines
Weibull distribution
Distribution functions
4 Citations (Scopus)

Challenges in cost analysis of innovative maintenance of distributed high-value assets

Kirkwood, L., Shehab, E., Baguley, P., Amorim-Melo, P. & Durazo-Cardenas, I., 2014. 4 p.

Research output: Contribution to conferencePaper

Condition monitoring
Sensors
Costs
Processing
3 Citations (Scopus)

Cost drivers of integrated maintenance in high-value systems

Amorim-Melo, P., Shehab, E., Kirkwood, L. & Baguley, P., 2014. 5 p.

Research output: Contribution to conferencePaper

Costs
Rails
Model structures
Resource allocation
Health
2010

Product-service systems across industry sectors: future research needs and challenges

Durugbo, C., Bankole, OO., Erkoyuncu, JA., Tiwari, A., Alcock, J. R., Roy, R. & Shehab, E., 2010. 8 p.

Research output: Contribution to conferencePaper

Industry
Systems analysis
2008
1 Citation (Scopus)

A work breakdown structure for implementing and costing an ERP project

Momoh, A., Roy, R. & Shehab, E., Jan 1 2008, p. 1245-1254. 10 p.

Research output: Contribution to conferencePaper

Enterprise resource planning
An enterprise
Work breakdown structure
Costing
Costs