Projects per year
Search results
-
Active
NextGenBCM: Block Caving Mining Systems – Strategies for Caveability Prediction and Hazard Management Using Next Generation Technologies
Suorineni, F. (PI), Tosi, D. (Co-PI), Poulopoulos, S. (Co-PI) & Imashev, A. (Co-PI)
1/1/25 → 12/31/27
Project: CRP
-
NVST: Development of stope wall convergence-based design approach for subvertical narrow-vein mining systems at depth
Suorineni, F. (PI)
1/1/24 → 12/31/26
Project: FDCRGP