Research Output per year
Research Output 2008 2019
Delay Causes in Kazakhstan’s Construction Projects and Remedial Measures
Hossain, M. A., Raiymbekov, D., Nadeem, A. & Kim, J., Jul 31 2019, In : International Journal of Construction Management.Research output: Contribution to journal › Article
Domain-Knowledge Enriched BIM in Construction 4.0: Applications in Design-for-Safety and Crane Safety Compliance
Hossain, M. A., Yeoh, J. K. W., Abbott, E. L. S. & Chua, D. K. H., 2019, (Accepted/In press) Construction 4.0: An innovation platform for the Built Environment. Sawhney, A., Riley, M. & Irizarry, J. (eds.). RoutledgeResearch output: Chapter in Book/Report/Conference proceeding › Chapter (peer-reviewed)
Effectiveness of Ring Roads in Reducing Traffic Congestion in Cities for Long Run: Big Almaty Ring Road Case Study
Nugmanova, A., Arndt, W-H., Hossain, M. A. & Kim, J., Sep 11 2019, In : Sustainability. 11, 18, 4973.Research output: Contribution to journal › Article
Investigation of wasteful activities using lean methodology: In perspective of kazakhstan's construction industry
Hossain, M. A., Bissenova, A. & Kim, J., Jan 1 2019, In : Buildings. 9, 5, 113.Research output: Contribution to journal › Article
Investigation of Wasteful Activities Using Lean Methodology: In Perspective of Kazakhstan’s Construction Industry
Bissenova, A., Hossain, M. A. & Kim, J., May 5 2019, In : Buildings. 9, 5Research output: Contribution to journal › Article
Perception and barriers to implementation of intensive and extensive green roofs in Dhaka, Bangladesh
Hossain, M. A., Shams, S., Amin, M., Reza, M. S. & Chowdhury, T. U., Apr 1 2019, In : Buildings. 9, 4, 79.Research output: Contribution to journal › Article
Towards digitizing the construction industry: State of the art of construction 4.0
Hossain, M. A. & Nadeem, A., May 2019, ISEC 2019 - 10th International Structural Engineering and Construction Conference. Ozevin, D., Ataei, H., Gurgun, A. P., Modares, M., Yazdani, S. & Singh, A. (eds.). ISEC Press, (ISEC 2019 - 10th International Structural Engineering and Construction Conference).Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
BIM for Existing Buildings: Potential Opportunities and Barriers
Hossain, M. A. & Yeoh, J. K. W., Jun 19 2018, In : IOP Conference Series: Materials Science and Engineering. 371, 1, 012051.Research output: Contribution to journal › Conference article
Delay Causes of Construction Projects in Kazakhstan
Hossain, M. A. & Raiymbekov, D., Sep 2018, 4th International Conference on New Advances in Civil Engineering. St. Petersburg, RussiaResearch output: Chapter in Book/Report/Conference proceeding › Conference contribution
Design-for-Safety knowledge library for BIM-integrated safety risk reviews
Hossain, M. A., Abbott, E. L. S., Chua, D. K. H., Nguyen, T. Q. & Goh, Y. M., Oct 1 2018, In : Automation in Construction. 94, p. 290-302 13 p.Research output: Contribution to journal › Article
Intelligent BIM record model for effective asset management of constructed facility
Hossain, M. A. & Ahmad Tarmizi, H., Aug 22 2018, In : MATEC Web of Conferences. 195, 06004.Research output: Contribution to journal › Conference article
Investigation of wasteful activities to improve construction productivity: In perspective of construction in Astana, Kazakhstan
Bissenova, A. & Hossain, M. A., Nov 2018.Research output: Contribution to conference › Paper
Preliminary phytochemical and pharmacological screenings of Plumbago indica L. And Alpinia conchigera Griff
Ibrahim, M., Hossain, M. A., Shajib, M. S. & Rashid, M. A., Jan 1 2018, In : Dhaka University Journal of Pharmaceutical Sciences. 17, 1, p. 73-79 7 p.Research output: Contribution to journal › Article
Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling
Ahmed, T., Hossain, S. M. & Hossain, M. A., Dec 21 2018, (Accepted/In press) In : International Journal of Construction Management.Research output: Contribution to journal › Article
Computational study of solvation free energy, dipole moment, polarizability, hyperpolarizability and molecular properties of betulin, a constituent of Corypha taliera (Roxb.)
Khan, M. F., Rashid, R. B., Hossain, M. A. & Rashid, M. A., Jan 1 2017, In : Dhaka University Journal of Pharmaceutical Sciences. 16, 1, p. 1-9 9 p.Research output: Contribution to journal › Article
Design for safety knowledge-based bim-integrated risk register system
Aslam Hossain, M. D., Abbott, E. L. S. & Chua, D. K. H., 2017, ISEC 2017 - 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction. ISEC PressResearch output: Chapter in Book/Report/Conference proceeding › Conference contribution
Preliminary phytochemical screenings and pharmacological activities of three medicinal plants of Bangladesh
Ibrahim, M., Kuddus, M. R., Hossain, M. A., Al-Mansur, M. A. & Rashi, M. A., Jan 1 2017, In : Dhaka University Journal of Pharmaceutical Sciences. 16, 2, p. 195-203 9 p.Research output: Contribution to journal › Article
Cu-doped flower-like hematite nanostructures for efficient water splitting applications
Tsege, E. L., Atabaev, T. S., Hossain, M. A., Lee, D., Kim, H. K. & Hwang, Y. H., Nov 1 2016, In : Journal of Physics and Chemistry of Solids. 98, p. 283-289 7 p.Research output: Contribution to journal › Article
Pt-coated TiO2 nanorods for photoelectrochemical water splitting applications
Atabaev, T. S., Hossain, M. A., Lee, D., Kim, H. K. & Hwang, Y. H., 2016, In : Results in Physics. 6, p. 373-376 4 p.Research output: Contribution to journal › Article
TiO2 nanofiber/nanoparticles composite photoelectrodes with improved light harvesting ability for dye-sensitized solar cells
Vu, H. H. T., Atabaev, T. S., Pham-Cong, D., Hossain, M. A., Lee, D., Dinh, N. N., Cho, C. R., Kim, H. K. & Hwang, Y. H., Mar 1 2016, In : Electrochimica Acta. 193, p. 166-171 6 p.Research output: Contribution to journal › Article
Overlapping design and construction activities and an optimization approach to minimize rework
Hossain, M. A. & Chua, D. K. H., 2014, In : International Journal of Project Management. 32, 6, p. 983-994 12 p.Research output: Contribution to journal › Article
Improving Productivity of Construction Operation Using Simulation Model
Hossain, S. M., Ahmed, T. & Hossain, M. A., 2013.Research output: Contribution to conference › Paper
Optimizing concurrent execution of design activities with minimum redesign
Hossain, M. A., Chua, D. K. H. & Liu, Z., May 2012, In : Journal of Computing in Civil Engineering. 26, 3, p. 409-420 12 p.Research output: Contribution to journal › Article
Predicting change propagation and impact on design schedule due to external changes
Chua, D. K. H. & Hossain, M. A., 2012, In : IEEE Transactions on Engineering Management. 59, 3, p. 483-493 11 p., 6017200.Research output: Contribution to journal › Article
A simulation model to study the impact of early information on design duration and redesign
Chua, D. K. H. & Hossain, M. A., Apr 2011, In : International Journal of Project Management. 29, 3, p. 246-257 12 p.Research output: Contribution to journal › Article
Autogeneration of simulation network of the design process
Hossain, M. A. & Chua, D. K. H., Sep 2010, In : Journal of Computing in Civil Engineering. 24, 5, p. 452-461 10 p.Research output: Contribution to journal › Article
Generating simulation network for design process based on DSM
Hossain, M. A. & Chua, D. K. H., 2009, Proceedings of the 2009 Winter Simulation Conference, WSC 2009. p. 2751-2758 8 p. 5429253Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
Simulation-based model for handling iteration and feedback loop in design
Hossain, M. A. & Chua, D. K. H., 2009, Proceedings of IGLC17: 17th Annual Conference of the International Group for Lean Construction. p. 511-522 12 p.Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
Reduced duration of the design projects with the concept of early estimation of design tasks
Chua, D. K. H. & Hossain, M. A., 2008, Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction. p. 485-494 10 p.Research output: Chapter in Book/Report/Conference proceeding › Conference contribution