Md Aslam Hossain

Dr., Assistant Professor

Accepting PhD Students

PhD projects

1. Development of BIM-Integrated Safety Knowledge Model for Safe Building Facility Management 2. Developing BIM model of existing building for effective facility management

  • 141 Citations
  • 7 h-Index
20082019
If you made any changes in Pure these will be visible here soon.

Research Output 2008 2019

Filter
Conference contribution
2019

Towards digitizing the construction industry: State of the art of construction 4.0

Hossain, M. A. & Nadeem, A., May 2019, ISEC 2019 - 10th International Structural Engineering and Construction Conference. Ozevin, D., Ataei, H., Gurgun, A. P., Modares, M., Yazdani, S. & Singh, A. (eds.). ISEC Press, (ISEC 2019 - 10th International Structural Engineering and Construction Conference).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Construction industry
Industry
Productivity
Augmented reality
Analog to digital conversion
2018

Delay Causes of Construction Projects in Kazakhstan

Hossain, M. A. & Raiymbekov, D., Sep 2018, 4th International Conference on New Advances in Civil Engineering. St. Petersburg, Russia

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2017
1 Citation (Scopus)

Design for safety knowledge-based bim-integrated risk register system

Aslam Hossain, M. D., Abbott, E. L. S. & Chua, D. K. H., 2017, ISEC 2017 - 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction. ISEC Press

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Construction industry
Life cycle
Identification (control systems)
Hazards
Costs
2009
1 Citation (Scopus)

Generating simulation network for design process based on DSM

Hossain, M. A. & Chua, D. K. H., 2009, Proceedings of the 2009 Winter Simulation Conference, WSC 2009. p. 2751-2758 8 p. 5429253

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Network Simulation
Design Process
Simulation Model
Estimability
Rework
2 Citations (Scopus)

Simulation-based model for handling iteration and feedback loop in design

Hossain, M. A. & Chua, D. K. H., 2009, Proceedings of IGLC17: 17th Annual Conference of the International Group for Lean Construction. p. 511-522 12 p.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Feedback
Process design
2008
2 Citations (Scopus)

Reduced duration of the design projects with the concept of early estimation of design tasks

Chua, D. K. H. & Hossain, M. A., 2008, Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction. p. 485-494 10 p.

Research output: Chapter in Book/Report/Conference proceedingConference contribution