Projects per year
Search results
-
Active
Hard Rock Tunnelling: A Generalized Model for Estimating TBM Performance and Disc Cutter Wear Life
Yagiz, S., Adoko, A. C., Rostami, J. & Hassanpour, J.
1/1/21 → 12/31/23
Project: Monitored by Research Administration
-
Development of cryogenic fracturing technology for coalbed methane production in Karaganda Coal Basin, Kazakhstan
Hazlett, R., Zhang, D., Yagiz, S., Ismailova , J., Teklu, T., Bekbauov, B., Wang, L., Kneafsey, T., Wu, Y. & Wang, Y.
1/1/21 → 12/31/23
Project: Monitored by Research Administration
-
Finished
Multivariate Mapping of Geometallurgical Variables with Complex Cross-Correlation Characteristics
3/20/18 → 6/30/21
Project: Monitored by Research Administration
-
Empirical stope design in Kazakhstan underground mines: improving the Mathews stability graph method
3/20/18 → 12/31/21
Project: Monitored by Research Administration