TY - GEN
T1 - Adjusted real option valuation to maximise mining project value - A case study using century mine
AU - Shafiee, S.
AU - Topal, E.
AU - Nehring, M.
PY - 2009
Y1 - 2009
N2 - Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a tool to adapt and revise mining projects under uncertainty and future variable movements. Most evaluation approaches simply assume that some variables are fixed, such as production rate, variable cost, fixed cost and lifetime of project. The first section of this paper reviews a comprehensive study of ROV in mining projects. The paper then introduces a new model that solves problems where previous methods lacked. The new method endeavours to find maximum mining project value by adding total cost as a function of production rate into ROV. The second section has been applied to a new model on the Century zinc mine in north-west Queensland, thus illustrating the future overview of that mine. The new version of ROV gave a significant positive value for the Century Mine, when the closure and reopening options where available throughout the life of the mine. Consequently, the new method evaluates real options to add value to mining projects, maximising project's value, estimating cost function, optimising production rates and offers opportunities in projects to amplify gains or to mitigate losses.
AB - Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a tool to adapt and revise mining projects under uncertainty and future variable movements. Most evaluation approaches simply assume that some variables are fixed, such as production rate, variable cost, fixed cost and lifetime of project. The first section of this paper reviews a comprehensive study of ROV in mining projects. The paper then introduces a new model that solves problems where previous methods lacked. The new method endeavours to find maximum mining project value by adding total cost as a function of production rate into ROV. The second section has been applied to a new model on the Century zinc mine in north-west Queensland, thus illustrating the future overview of that mine. The new version of ROV gave a significant positive value for the Century Mine, when the closure and reopening options where available throughout the life of the mine. Consequently, the new method evaluates real options to add value to mining projects, maximising project's value, estimating cost function, optimising production rates and offers opportunities in projects to amplify gains or to mitigate losses.
UR - https://www.scopus.com/pages/publications/84888172374
UR - https://www.scopus.com/pages/publications/84888172374#tab=citedBy
M3 - Conference contribution
AN - SCOPUS:84888172374
SN - 9781627489362
T3 - Australasian Institute of Mining and Metallurgy Publication Series
SP - 125
EP - 134
BT - Project Evaluation Conference 2009
T2 - Project Evaluation Conference 2009
Y2 - 21 April 2009 through 22 April 2009
ER -