Application of RMR for Estimating Rock-Mass–Related TBM Utilization and Performance Parameters: A Case Study

O. Frough, S. R. Torabi, S. Yagiz

Research output: Contribution to journalArticlepeer-review

10 Citations (Scopus)
Original languageEnglish
Pages (from-to)1305-1312
Number of pages8
JournalRock Mechanics and Rock Engineering
Volume48
Issue number3
DOIs
Publication statusPublished - May 1 2015
Externally publishedYes

Keywords

  • RMR system
  • TBM performance
  • Utilization

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Geotechnical Engineering and Engineering Geology
  • Geology

Cite this