The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to "play out". However, many mining companies feel comfortable with point estimates of all project parameters but realize that no parameter value is known with certainty. A model that incorporates uncertainties and is able to adapt will help deliver a design with a better riskreturn profile. In this paper, a new methodology is developed in order to have a design that is flexible and able to adapt with change. Following recent research on decision making methods in mine planning, this paper develops a mixed integer programming model that determines the optimal design for simulated stochastic parameters. The paper shows how to incorporate optionality (flexibility) in relation to mine, stockpile, plant and capacity constraint options. Obtained results are promising and are helping decision makers to think in terms of value, risk and frequency of execution.

Original languageEnglish
Pages (from-to)212-226
Number of pages15
JournalJournal of Mining Science
Volume47
Issue number2
Publication statusPublished - Mar 2011
Externally publishedYes

Fingerprint

open pit mine
Industry
Shareholders
Integer programming
Decision making
decision making
Planning
methodology
industry
parameter
Uncertainty
decision
project

Keywords

  • Flexibility
  • Mine design
  • Real options
  • Robust design
  • Stochastic simulation
  • Uncertainty

ASJC Scopus subject areas

  • Geotechnical Engineering and Engineering Geology
  • Geology

Cite this

Groeneveld, B., & Topal, E. (2011). Flexible open-pit mine design under uncertainty. Journal of Mining Science, 47(2), 212-226.

Flexible open-pit mine design under uncertainty. / Groeneveld, B.; Topal, E.

In: Journal of Mining Science, Vol. 47, No. 2, 03.2011, p. 212-226.

Research output: Contribution to journalArticle

Groeneveld, B & Topal, E 2011, 'Flexible open-pit mine design under uncertainty', Journal of Mining Science, vol. 47, no. 2, pp. 212-226.
Groeneveld B, Topal E. Flexible open-pit mine design under uncertainty. Journal of Mining Science. 2011 Mar;47(2):212-226.
Groeneveld, B. ; Topal, E. / Flexible open-pit mine design under uncertainty. In: Journal of Mining Science. 2011 ; Vol. 47, No. 2. pp. 212-226.
@article{afcac03cee4f4c4da6b68c4005b4ca7f,
title = "Flexible open-pit mine design under uncertainty",
abstract = "The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to {"}play out{"}. However, many mining companies feel comfortable with point estimates of all project parameters but realize that no parameter value is known with certainty. A model that incorporates uncertainties and is able to adapt will help deliver a design with a better riskreturn profile. In this paper, a new methodology is developed in order to have a design that is flexible and able to adapt with change. Following recent research on decision making methods in mine planning, this paper develops a mixed integer programming model that determines the optimal design for simulated stochastic parameters. The paper shows how to incorporate optionality (flexibility) in relation to mine, stockpile, plant and capacity constraint options. Obtained results are promising and are helping decision makers to think in terms of value, risk and frequency of execution.",
keywords = "Flexibility, Mine design, Real options, Robust design, Stochastic simulation, Uncertainty",
author = "B. Groeneveld and E. Topal",
year = "2011",
month = "3",
language = "English",
volume = "47",
pages = "212--226",
journal = "Journal of Mining Science",
issn = "1062-7391",
publisher = "Springer New York",
number = "2",

}

TY - JOUR

T1 - Flexible open-pit mine design under uncertainty

AU - Groeneveld, B.

AU - Topal, E.

PY - 2011/3

Y1 - 2011/3

N2 - The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to "play out". However, many mining companies feel comfortable with point estimates of all project parameters but realize that no parameter value is known with certainty. A model that incorporates uncertainties and is able to adapt will help deliver a design with a better riskreturn profile. In this paper, a new methodology is developed in order to have a design that is flexible and able to adapt with change. Following recent research on decision making methods in mine planning, this paper develops a mixed integer programming model that determines the optimal design for simulated stochastic parameters. The paper shows how to incorporate optionality (flexibility) in relation to mine, stockpile, plant and capacity constraint options. Obtained results are promising and are helping decision makers to think in terms of value, risk and frequency of execution.

AB - The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to "play out". However, many mining companies feel comfortable with point estimates of all project parameters but realize that no parameter value is known with certainty. A model that incorporates uncertainties and is able to adapt will help deliver a design with a better riskreturn profile. In this paper, a new methodology is developed in order to have a design that is flexible and able to adapt with change. Following recent research on decision making methods in mine planning, this paper develops a mixed integer programming model that determines the optimal design for simulated stochastic parameters. The paper shows how to incorporate optionality (flexibility) in relation to mine, stockpile, plant and capacity constraint options. Obtained results are promising and are helping decision makers to think in terms of value, risk and frequency of execution.

KW - Flexibility

KW - Mine design

KW - Real options

KW - Robust design

KW - Stochastic simulation

KW - Uncertainty

UR - http://www.scopus.com/inward/record.url?scp=80855124340&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=80855124340&partnerID=8YFLogxK

M3 - Article

VL - 47

SP - 212

EP - 226

JO - Journal of Mining Science

JF - Journal of Mining Science

SN - 1062-7391

IS - 2

ER -