Abstract
When construction delays occur, it is necessary to ascertain the liabilities of the contracting parties and to direct the appropriate amount of resources to recover the schedule. Unfortunately, delay analysis and schedule compression are normally treated as separate or independent aspects. This paper examines the feasibility of integrating the delay analysis and schedule compression functions into a broad-scoped two-stage process. The main issue is shown to be the kind of delay analysis required for each stage of the process and seven existing techniques are illustrated for use in conjunction with schedule compression. Since the current form and assumptions of delay analysis techniques are unlikely to provide the necessary level of feedback reliability for recovering delays, it is necessary to modify these techniques by incorporating some means of delay type scrutiny, excusable delays updating, and treatment of concurrent delays. The modified delay analysis techniques can serve as a basis for negotiation between the client and contractor and hence improve the interdisciplinary relations.
Original language | English |
---|---|
Pages (from-to) | 3-17 |
Number of pages | 15 |
Journal | Construction Innovation |
Volume | 4 |
Issue number | 1 |
DOIs | |
Publication status | Published - Mar 1 2004 |
Externally published | Yes |
Keywords
- Construction delays
- Delay analysis
- Delay typology
- Planning
- Scheduling
ASJC Scopus subject areas
- Control and Systems Engineering
- General Computer Science
- Civil and Structural Engineering
- Architecture
- Building and Construction