Influence of acceleration approaches on the corrosion behavior of embedded steel in mortar

Xiaogang Zhang, Guiqin Zuo, Pei Xu, Shazim Memon, Hongfang Sun, Feng Xing

Research output: Contribution to journalArticle

Abstract

In this article, the influence of three acceleration approaches (electrochemical corrosion method, alternate wetting and drying method, and salt spray method) on the corrosion behavior of a steel bar embedded in mortar cover was investigated. The steel corrosion and the mortar cracking were characterized by using an X-ray microcomputed tomography (μCT) and scanning electron microscopy (SEM) and energy dispersive X-ray spectrometry (EDS) techniques. The results showed that the cracking time of mortar was the longest in the salt spray method (approximately 384 days), followed by the alternate wetting and drying method (approximately 269 days), and the electrochemical corrosion method (approximately 66 days). For similar maximum width of cracks on the surface of concrete cover, the electrochemical method generally resulted in a higher level of corrosion in reinforcement than the other two methods. The corrosion products of steel and the distribution of crack patterns obtained from the salt spray method were more nonuniformly distributed than the ones obtained from alternate wetting and drying method whereas those formed via the electrochemical method had a uniform distribution. The aforementioned findings are also valid for the distribution of crack patterns. In terms of the composition of corrosion products, the value of the atomic ratio of iron to oxygen (Fe/O) in the wetting and drying and salt spray methods was smaller than that obtained in the electrochemical method because the specimens under the former two methods were exposed to air for a much longer period of time than in the electrochemical method.

Original languageEnglish
Article number11
JournalAdvances in Civil Engineering Materials
Volume8
Issue number3
DOIs
Publication statusPublished - Jun 3 2019

Fingerprint

Steel
Mortar
Wetting
Drying
Salts
Corrosion
Electrochemical corrosion
Cracks
Steel corrosion
Tomography
Energy dispersive spectroscopy
Reinforcement
Iron
Concretes
Oxygen
X rays
Scanning electron microscopy
Air
Chemical analysis

Keywords

  • Accelerated corrosion
  • Electrochemistry
  • Salt spray
  • Wetting and drying

ASJC Scopus subject areas

  • Ceramics and Composites
  • Civil and Structural Engineering
  • Mechanics of Materials
  • Polymers and Plastics
  • Metals and Alloys
  • Materials Chemistry

Cite this

Influence of acceleration approaches on the corrosion behavior of embedded steel in mortar. / Zhang, Xiaogang; Zuo, Guiqin; Xu, Pei; Memon, Shazim; Sun, Hongfang; Xing, Feng.

In: Advances in Civil Engineering Materials, Vol. 8, No. 3, 11, 03.06.2019.

Research output: Contribution to journalArticle

Zhang, Xiaogang ; Zuo, Guiqin ; Xu, Pei ; Memon, Shazim ; Sun, Hongfang ; Xing, Feng. / Influence of acceleration approaches on the corrosion behavior of embedded steel in mortar. In: Advances in Civil Engineering Materials. 2019 ; Vol. 8, No. 3.
@article{83c89fa658004c7287e4932754dcb310,
title = "Influence of acceleration approaches on the corrosion behavior of embedded steel in mortar",
abstract = "In this article, the influence of three acceleration approaches (electrochemical corrosion method, alternate wetting and drying method, and salt spray method) on the corrosion behavior of a steel bar embedded in mortar cover was investigated. The steel corrosion and the mortar cracking were characterized by using an X-ray microcomputed tomography (μCT) and scanning electron microscopy (SEM) and energy dispersive X-ray spectrometry (EDS) techniques. The results showed that the cracking time of mortar was the longest in the salt spray method (approximately 384 days), followed by the alternate wetting and drying method (approximately 269 days), and the electrochemical corrosion method (approximately 66 days). For similar maximum width of cracks on the surface of concrete cover, the electrochemical method generally resulted in a higher level of corrosion in reinforcement than the other two methods. The corrosion products of steel and the distribution of crack patterns obtained from the salt spray method were more nonuniformly distributed than the ones obtained from alternate wetting and drying method whereas those formed via the electrochemical method had a uniform distribution. The aforementioned findings are also valid for the distribution of crack patterns. In terms of the composition of corrosion products, the value of the atomic ratio of iron to oxygen (Fe/O) in the wetting and drying and salt spray methods was smaller than that obtained in the electrochemical method because the specimens under the former two methods were exposed to air for a much longer period of time than in the electrochemical method.",
keywords = "Accelerated corrosion, Electrochemistry, Salt spray, Wetting and drying",
author = "Xiaogang Zhang and Guiqin Zuo and Pei Xu and Shazim Memon and Hongfang Sun and Feng Xing",
year = "2019",
month = "6",
day = "3",
doi = "10.1520/ACEM20190011",
language = "English",
volume = "8",
journal = "Advances in Civil Engineering Materials",
issn = "2379-1357",
publisher = "ASTM International",
number = "3",

}

TY - JOUR

T1 - Influence of acceleration approaches on the corrosion behavior of embedded steel in mortar

AU - Zhang, Xiaogang

AU - Zuo, Guiqin

AU - Xu, Pei

AU - Memon, Shazim

AU - Sun, Hongfang

AU - Xing, Feng

PY - 2019/6/3

Y1 - 2019/6/3

N2 - In this article, the influence of three acceleration approaches (electrochemical corrosion method, alternate wetting and drying method, and salt spray method) on the corrosion behavior of a steel bar embedded in mortar cover was investigated. The steel corrosion and the mortar cracking were characterized by using an X-ray microcomputed tomography (μCT) and scanning electron microscopy (SEM) and energy dispersive X-ray spectrometry (EDS) techniques. The results showed that the cracking time of mortar was the longest in the salt spray method (approximately 384 days), followed by the alternate wetting and drying method (approximately 269 days), and the electrochemical corrosion method (approximately 66 days). For similar maximum width of cracks on the surface of concrete cover, the electrochemical method generally resulted in a higher level of corrosion in reinforcement than the other two methods. The corrosion products of steel and the distribution of crack patterns obtained from the salt spray method were more nonuniformly distributed than the ones obtained from alternate wetting and drying method whereas those formed via the electrochemical method had a uniform distribution. The aforementioned findings are also valid for the distribution of crack patterns. In terms of the composition of corrosion products, the value of the atomic ratio of iron to oxygen (Fe/O) in the wetting and drying and salt spray methods was smaller than that obtained in the electrochemical method because the specimens under the former two methods were exposed to air for a much longer period of time than in the electrochemical method.

AB - In this article, the influence of three acceleration approaches (electrochemical corrosion method, alternate wetting and drying method, and salt spray method) on the corrosion behavior of a steel bar embedded in mortar cover was investigated. The steel corrosion and the mortar cracking were characterized by using an X-ray microcomputed tomography (μCT) and scanning electron microscopy (SEM) and energy dispersive X-ray spectrometry (EDS) techniques. The results showed that the cracking time of mortar was the longest in the salt spray method (approximately 384 days), followed by the alternate wetting and drying method (approximately 269 days), and the electrochemical corrosion method (approximately 66 days). For similar maximum width of cracks on the surface of concrete cover, the electrochemical method generally resulted in a higher level of corrosion in reinforcement than the other two methods. The corrosion products of steel and the distribution of crack patterns obtained from the salt spray method were more nonuniformly distributed than the ones obtained from alternate wetting and drying method whereas those formed via the electrochemical method had a uniform distribution. The aforementioned findings are also valid for the distribution of crack patterns. In terms of the composition of corrosion products, the value of the atomic ratio of iron to oxygen (Fe/O) in the wetting and drying and salt spray methods was smaller than that obtained in the electrochemical method because the specimens under the former two methods were exposed to air for a much longer period of time than in the electrochemical method.

KW - Accelerated corrosion

KW - Electrochemistry

KW - Salt spray

KW - Wetting and drying

UR - http://www.scopus.com/inward/record.url?scp=85066601685&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85066601685&partnerID=8YFLogxK

U2 - 10.1520/ACEM20190011

DO - 10.1520/ACEM20190011

M3 - Article

AN - SCOPUS:85066601685

VL - 8

JO - Advances in Civil Engineering Materials

JF - Advances in Civil Engineering Materials

SN - 2379-1357

IS - 3

M1 - 11

ER -