Accurate cost estimation is a critical component of mining project evaluation to determine whether the proposed project is clearly feasible, doubtfully feasible or clearly uneconomic. At the beginning of the process, it is very difficult for project evaluators to find reliable relevant data that can be used for all phases of the cost estimation. This paper provides an overview of published work on mining cost estimation methods, data sources and available software. It also introduces the concept of indices for different components of mining projects, discusses their historical movements, and then it compares mining cost indices in the USA, Canada and Australia. It also introduces a new econometric model for estimating the operating cost and capital cost of a coal mining project. The total operating cost and capital cost of mining are calculated by using the proposed econometric model and verified by comparing the outputs with CostMine data and Sherpa software outputs for a surface coal mine. The model shows that the capital cost and production rate have a negative effect on the operating cost, while the deposit average thickness and stripping ratio have a positive effect.

Original languageEnglish
Pages (from-to)109-116
Number of pages8
JournalTransactions of the Institution of Mining and Metallurgy, Section A: Mining Technology
Volume121
Issue number3
DOIs
Publication statusPublished - 2012
Externally publishedYes

Fingerprint

Coal mines
coal mine
cost
Costs
Operating costs
econometrics
software
Deposits
estimation method
coal mining
project

Keywords

  • Econometrics models
  • Mineral resource
  • Mining cost

ASJC Scopus subject areas

  • Geotechnical Engineering and Engineering Geology
  • Geology

Cite this

New approach for estimating total mining costs in surface coal mines. / Shafiee, S.; Topal, E.

In: Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, Vol. 121, No. 3, 2012, p. 109-116.

Research output: Contribution to journalArticle

@article{a82f2e84e6ab42eab00d5c7b70b280df,
title = "New approach for estimating total mining costs in surface coal mines",
abstract = "Accurate cost estimation is a critical component of mining project evaluation to determine whether the proposed project is clearly feasible, doubtfully feasible or clearly uneconomic. At the beginning of the process, it is very difficult for project evaluators to find reliable relevant data that can be used for all phases of the cost estimation. This paper provides an overview of published work on mining cost estimation methods, data sources and available software. It also introduces the concept of indices for different components of mining projects, discusses their historical movements, and then it compares mining cost indices in the USA, Canada and Australia. It also introduces a new econometric model for estimating the operating cost and capital cost of a coal mining project. The total operating cost and capital cost of mining are calculated by using the proposed econometric model and verified by comparing the outputs with CostMine data and Sherpa software outputs for a surface coal mine. The model shows that the capital cost and production rate have a negative effect on the operating cost, while the deposit average thickness and stripping ratio have a positive effect.",
keywords = "Econometrics models, Mineral resource, Mining cost",
author = "S. Shafiee and E. Topal",
year = "2012",
doi = "10.1179/1743286312Y.0000000011",
language = "English",
volume = "121",
pages = "109--116",
journal = "Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology",
issn = "1474-9009",
publisher = "Maney Publishing",
number = "3",

}

TY - JOUR

T1 - New approach for estimating total mining costs in surface coal mines

AU - Shafiee, S.

AU - Topal, E.

PY - 2012

Y1 - 2012

N2 - Accurate cost estimation is a critical component of mining project evaluation to determine whether the proposed project is clearly feasible, doubtfully feasible or clearly uneconomic. At the beginning of the process, it is very difficult for project evaluators to find reliable relevant data that can be used for all phases of the cost estimation. This paper provides an overview of published work on mining cost estimation methods, data sources and available software. It also introduces the concept of indices for different components of mining projects, discusses their historical movements, and then it compares mining cost indices in the USA, Canada and Australia. It also introduces a new econometric model for estimating the operating cost and capital cost of a coal mining project. The total operating cost and capital cost of mining are calculated by using the proposed econometric model and verified by comparing the outputs with CostMine data and Sherpa software outputs for a surface coal mine. The model shows that the capital cost and production rate have a negative effect on the operating cost, while the deposit average thickness and stripping ratio have a positive effect.

AB - Accurate cost estimation is a critical component of mining project evaluation to determine whether the proposed project is clearly feasible, doubtfully feasible or clearly uneconomic. At the beginning of the process, it is very difficult for project evaluators to find reliable relevant data that can be used for all phases of the cost estimation. This paper provides an overview of published work on mining cost estimation methods, data sources and available software. It also introduces the concept of indices for different components of mining projects, discusses their historical movements, and then it compares mining cost indices in the USA, Canada and Australia. It also introduces a new econometric model for estimating the operating cost and capital cost of a coal mining project. The total operating cost and capital cost of mining are calculated by using the proposed econometric model and verified by comparing the outputs with CostMine data and Sherpa software outputs for a surface coal mine. The model shows that the capital cost and production rate have a negative effect on the operating cost, while the deposit average thickness and stripping ratio have a positive effect.

KW - Econometrics models

KW - Mineral resource

KW - Mining cost

UR - http://www.scopus.com/inward/record.url?scp=84866433124&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84866433124&partnerID=8YFLogxK

U2 - 10.1179/1743286312Y.0000000011

DO - 10.1179/1743286312Y.0000000011

M3 - Article

VL - 121

SP - 109

EP - 116

JO - Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology

JF - Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology

SN - 1474-9009

IS - 3

ER -